Load Path
Build a bridge from wood, steel, heavy steel and rope, then send a car, a truck and a tank across. Every member shows its real force: beams yield in tension or buckle in compression (long ones first), ropes only pull and go slack if pushed. Anchor to the cliff walls and, on long maps, the rock island.
Level
Material120 mm square tube · all-rounder · max 4.5 m
Building · 1. First crossing — 8 m · car 50 kN, truck 150 kN, tank 260 kN
$0 / $2,000
Pick a material, then tap a joint and another to place a member. Build the road along the bottom first.
The physics
Test the bridge to see the forces
Tip: triangles make a truss rigid. Deeper trusses lower the chord forces (≈ M/h), long compression members buckle, and ropes are cheap but only pull — great as hangers or ties. Square joints are anchors.
Hints: get the most from each member
- Rope ($40/m, up to 12 m) only pulls. Use it for diagonals that lean toward mid-span from the top (they stretch), hangers from a high point, and ties back to the cliff walls. Never where it gets pushed — it goes slack.
- Wood ($60/m) is fine in tension and for short members (2 m) in compression, but buckles quickly when longer. Good for the road and short verticals.
- Steel ($100/m) is the all-rounder for compression members up to about 3 m.
- Heavy steel ($220/m) only where forces peak: the top chord near mid-span and the end posts — usually a few members, not the whole bridge.
- Depth: chord force ≈ M / h, so a 4 m deep truss carries half the chord force of a 2 m one — but its diagonals are longer and buckle sooner.
- Supports: bending moment grows with span squared. Bracing down to the cliff walls or the island shortens the span and saves the most money.
- After a test, tap members: green = room to spare (downgrade), orange/red = near the limit (upgrade).
Pinned joints, vehicles as moving point loads, self-weight ignored. Stars stay in this browser. More physics: 2D simulations.